WestConnex New M5 – MOC2 Buildings

Design & Engineer Stage Scaffolding System
- OVERVIEW
WestConnex New M5 - MOC2 Buildings
WestConnex New M5 - MOC2 Buildings
WestConnex New M5 - MOC2 Buildings

PROJECT TYPE

Public Infrastructure (Design & Engineer Stage Scaffolding System)


PROJECT LOCATION

WestConnex New M5 - MOC2 Buildings, Sydney NSW


DURATION

Jun 2018 - Current


CLIENT

CPB Dragados Samsung Joint Venture

PROJECT SUMMARY

The Bexley Motorway Operations Complex will be located within the existing M5 linear parkland alongside Bexley Road and will have an approximate height of 13 metres from ground level. The Bexley Motorway Operations Complex is designed to create minimal visual clutter with simple and elegant buildings that visually integrate into the surrounding parklands, from ground level its ventilation shaft will extend 25m to the tunnel floor.

In the early stages of this project An-CO provided a design and construct service to the concrete structures contractor on the construction of a 25m deep Ventialtion Shaft and the basement of a Substation Building. An-CO provided scaffold as formwork support for insitu concrete elements such as beams, columns and suspended floor slabs, along access scaffold for the installation of structural precast wall panels.

Later in the project An-CO provided a design and construct service to the client for external perimeter scaffold to two structures, a substation and a ventilation building that service the Ventilation Shaft. The scaffold was installed to facilitate the installation of structural steel, precast architectural façade panelling, M&E services and metal wall and roofing. Scaffold was also provided to the M&E teams to assist with access and support for installation of cabling, ducting, attenuators, dampers and extractor fans.

OVERVIEW

TBC

OUTCOME

TBC

Other Projects

WestConnex New M5 – MOC3 Buildings
Delivered by Sydney Motorway Corporation as a series of separate projects, the WestConnex New M5 project will run from the existing M5 East corridor at Beverly Hills via twin tunnels to St Peter’s, providing improved access to the airport, South Syd
WestConnex New M5 – MOC1 Buildings
Delivered by Sydney Motorway Corporation as a series of separate projects, the 33km motorway is to connect Sydney’s western and south-western suburbs with the Sydney CBD, Sydney Airport and Port Botany. The project will ease congestion, provide occu
Commonwealth Games Village
Gold Coast 2018 Commonwealth Games Village 14-hectare mixed-use urban renewal project sits at the heart of the Gold Coast Health and Knowledge Precinct and performed a central role in hosting the 2018 Commonwealth Games athletes. Formerly known as Parklan
Sydney Metro Martin Place Station
As the new Martin Place Station is built underground, the integrated station development will be able to be built above the station at the same time. This helps reduce community impacts and allows for the buildings to be completed close to when Sydney Met
Sydney Metro West
An-Co delivered all scaffolding access solutions for the TBM build and demobilisation works at Rosehill and Sydney Olympic Park for Gamuda, supporting the assembly and disassembly of tunnel boring machines.
Chatswood Metro Towers
An-Co provided access solutions for the remediation works at Chatswood Metro Towers, working alongside RM Watson to support the replacement of combustible cladding as part of the Government remediation program. The scope comprised seven mast climber units
Sydney Metro East
An-Co delivered all major scaffolding works across the Eastern Tunnelling Package, including critical site access solutions into the east and west shafts at the Hunter Street Station site. Over 450 tonnes of scaffolding were installed across the project,