- OVERVIEW




PROJECT TYPE
Rail Infrastructure (Western Tunnelling Package)
PROJECT LOCATION
Sydney, NSW
DURATION
Completed February 2026
CLIENT
Gamuda
PROJECT SUMMARY
An-Co delivered all scaffolding access solutions for the TBM build and demobilisation works at Rosehill and Sydney Olympic Park for Gamuda, supporting the assembly and disassembly of tunnel boring machines.
The scope also included the construction of two specialised hanging stretcher access systems within the Parramatta Station boxes, designed to accommodate ongoing excavation works with integrated lift access installed and progressively extended as excavation advanced.
An-Co additionally provided access solutions for the FRP scope at both Clyde and Westmead, including the installation of heavy-duty headwall scaffolding structures weighing up to 80 tonnes.
OVERVIEW
The project required detailed staging, complex engineering coordination and close collaboration with tunnelling and excavation teams across multiple sites. A workforce of 30 scaffolders was deployed throughout, with works spanning TBM assembly, station box access and major structural scaffolding across the wider package.
OUTCOME
TBC
&geometry(245x54))
)
)
)
)
)
)
)
